The investment area located on the Ostrow Grabowski peninsula is the largest area for future investments in the Szczecin port. Thanks to its convenient location in the centre of the port, it allows for the creation of industries related to port turnover.
The vast majority of Ostrow Grabowski is located in the central and western part, on the side of Dębicki Chnnel, where the Finish Quay, designed for handling containerised general cargo, is already in operation. Another quay under construction is the Norwegian quay with a projected technical depth of 12.5m and a total length of 300m, which is an extension not only of the berthing line of the Finnish quay, but also of the crane rail system for container cranes. Other investments planned, will be a consequence of the modernisation and deepening of the Świnoujście-Szczecin fairway to a depth of 12.5m.
The location of Ostrow Grabowski, between the currently operated general cargo part of the port and the modernised waterway, is more than 3 km of the projected mooring line. This creates ideal conditions for the location of transhipment and storage terminals using the increased depth of up to 12.5m.
Land designation
Loading and storage quay.
The area is perfectly communicated through a new road and rail access. There are utilities connected to the border of the new container terminal: electricity, water, sewage. An undeniable advantage is the close proximity of the built and ready to lease infrastructure for the logistics centre.
Location of Ostrow Grabowski
The prospective development project of Ostrow Grabowski is envisaged for the period 2023 - 2050 and includes successive development of the areas starting from the best treated areas, in the following order:
The prospective development project of Ostrow Grabowski is envisaged for the period 2023 -
2050 and includes successive development of the areas starting from the best treated areas, in the following order:
Western part (Stage 1) 2022 - 2027
South-eastern part (Stage 2) 2028 - 2034
North-eastern part (Stage 3) 2035 – 2041
Western part - Stage 1
Stage I includes development of four investment plots, in the western part of the peninsula, with a total area of 35.2 ha, as back-up facilities for the Debicki Channel, which will be deepened to 12.5 m and widened to 200 m. Preparation of storage yards, parking areas and car parks with specified load-bearing capacities will remain the responsibility of future operators.
Development of the western part of Ostrow Grabowski (2022 - 2027) - Stage I.
South-eastern part - Stage 2
Stage II includes the development of two investment plots of a total area of 10.31 hectares as a
back-up area for the 12.5 m deepened Mielenski Trench and an area of about 16.6 hectares for the construction of the target transport system.
Development of the South-East and Central parts (2028 - 2034) - Stage II
North-eastern part - Stage III
Stage III includes the development of the remaining four investment plots with a total area of
31.34 ha as a back-up area for the 12.5m deepened Mielensk Trench and an area of about 1.6 ha for the target road layout.
Development of the North-East (2035 - 2041) - Stage III
Media availability at Ostrów Grabowski
Electricity (Y/N) | Y |
Voltage[kV] | 15kV |
Available power capacity [MW] |
1MV |
Gas (Y/N) |
N |
Connection point (distance |
500m |
Calorific value MJ/Nm3 |
36,0 MJ/Nm3 |
Pipe diameter mm |
90mm |
Available capacity Nm3/h |
No data available |
Water supply (Y/N) |
Y (social) |
Available capacity m3/24h |
1900m3/24h |
Sewage discharge (Y/N) |
N |
Connection point (distance from |
500m |
Available capacity m3/24h |
No data available |
Wastewater treatment plant on site or in the immediate vicinity (Y/N) |
Y |
Telephone (Y/N) |
Y |
If you are interested in the investment offer of Ostrow Grabowski, please contact Ms. Ewa Kurdyła, Commercial Manager, phone: +48 91 430 84 40 or mobile: +48 665 431 165, e-mail: ekurdyla@port.szczecin.pl